which element can savings be gained through value engineering exercise for a health care centre?
I am currently in my second year studying quantity surveying (undergraduate).
How value engineering is different from whole life costing?
Hi,
In my experience value engineering is looking at what you are trying to achieve and then analysing each aspect of the proposed solution from a technical point of view. Is it needed at all, is there a cheaper way that still meets the objectives, have there been any innovations since the original plans/design was created, is there a way to speed up the process without detriment?
There is quite a good overview at -
http://www.crowddynamics.com/Value%20Engineering/Value%20Engineering.htm
Keep it in public hands and attach a gym.
References :
Hi,
In my experience value engineering is looking at what you are trying to achieve and then analysing each aspect of the proposed solution from a technical point of view. Is it needed at all, is there a cheaper way that still meets the objectives, have there been any innovations since the original plans/design was created, is there a way to speed up the process without detriment?
There is quite a good overview at -
http://www.crowddynamics.com/Value%20Engineering/Value%20Engineering.htm
References :